Skip to content
38,400 NODES · LIVE

Industrial IoT · Edge Computing Systems Integration

Ubiquitous engineering for the always-on enterprise.

Embedded hardware, edge firmware, and distributed orchestration — co-designed with your team from proof-of-concept to fleet-scale rollout. Deployed on 38,400+ edge nodes across 27 countries.

FLEET STATUS 38,412 nodes · 99.982% uptime · 27 countries

PROVEN AT FLEET SCALE

  • 38,400+ Edge nodes under active management
  • 27 Countries with live deployments
  • 99.982% Measured fleet uptime · trailing 12 mo
  • 14 wk Avg. time-to-first-production-deployment
2024 Gartner Cool Vendor — Edge Computing 2025 IDC MarketScape Major Player — Industrial IoT for Heavy Industry 2023 Embedded Computing Design — Edge Platform of the Year ISO 9001:2015 · SOC 2 Type II attested

THE PLATFORM

One accountable vendor across the full edge stack.

Most edge programs stitch together three vendors — a board house, a firmware shop, and an orchestrator. Pervasive Systems ships all three as one platform, validated end-to-end before it reaches your line.

01 · HARDWARE

Reference SOMs & Gateways

Pre-validated System-on-Module families across NXP i.MX, Qualcomm, and AMD Kria. Carrier boards designed for -40°C to +85°C, with sub-15-minute zero-touch onboarding on supported SKUs.

Form factors
SOM, fanless gateway, DIN-rail
Validated SKUs
14 SOM families
BSP bring-up
< 48 hours
Hardware reference designs

02 · FIRMWARE

Pervasive Edge Linux (PEL)

A maintained Yocto-based distribution with a 10-year security cadence, signed OTA pipelines, and a deterministic time-sensitive networking stack. Built for fleets, not demos.

Base
Yocto Kirkstone, LTS kernel
OTA
Signed, staged, rollback-aware
TSN
IEEE 802.1Qbv/Qcc profiles
PEL release notes

03 · ORCHESTRATION

Pervasive Device Cloud

Fleet management, edge AI model delivery, and policy-as-code across hundreds of thousands of nodes. Free public tier supports 100 devices indefinitely — used by 4,300+ developers as a sandbox.

Free tier
100 devices, unlimited time
Enterprise
Role-based, audit, SAML/SCIM
Edge AI
Model registry + OTA
Device Cloud overview

FIELD DEPLOYMENTS

Built for verticals where downtime is not a metric.

Four programs from the past 18 months — manufacturing lines, port logistics, district-scale smart infrastructure, and a defense-adjacent industrial program — all running on the same reference platform.

Automotive manufacturing line with robotic welders and overhead conveyors

HEAVY MANUFACTURING

Tier-1 automotive supplier — 7 plants, 4,200 nodes

Replaced a legacy SCADA stack with PEL-based gateways and Device Cloud orchestration. Vision-based defect detection at line speed, with model OTA across all seven plants in one transaction.

  • 4,200edge nodes
  • 11 wkto first prod
  • −38%false-reject rate
Container port terminal with stacked containers and gantry cranes

PORT LOGISTICS

European deep-water port — RTK-corrected yard tracking

Sub-meter container tracking across 1,800 acres, mesh-networked between cranes and yard trucks.

Smart-city environmental sensor mounted on streetlight

SMART INFRASTRUCTURE

Metropolitan district — 1,100 air-quality & traffic nodes

Solar-powered, cellular-backhauled, with on-device inference for congestion detection.

Ruggedized edge enclosure for harsh-environment deployment

DEFENSE-ADJACENT INDUSTRIAL

U.S. DoD program — hardened fleet across three sites

Sole-source supplier on three U.S. Department of Defense programs. CMVP-validated cryptography, FIPS-aligned OTA.

OUTCOMES

The benchmark that closes the deal.

14wk

Average customer time-to-first-production-deployment.

−11mo

Faster than the 65-week in-house benchmark from our 2024 customer survey (n=212).

+71NPS

Customer NPS across 212 surveyed enterprise accounts in 2024.

Book an Edge Architecture Review

30 minutes with a solutions engineer. No deck — your topology on the whiteboard.

FROM THE FIELD

We expected six months of BSP bring-up and we got two days. PEL shipped on our reference board faster than we could order the evaluation kit from the silicon vendor. That changed the program.

Marisol Hendrick Director of Engineering, Tier-1 automotive supplier

We manage 4,200 nodes across seven plants. The last quarterly incident review lasted eleven minutes because there were no incidents. I have never said that sentence about a fleet this size.

Devraj Anand VP Operations, heavy-industry manufacturer